SyncDrawings

OUR TECHNOLOGICAL EDGE

THE SYNCDRAWINGS PLATFORM

While traditional BIM consultants stop at handing over 3D models or static PDFs, ABWPL ensures our engineering precision translates flawlessly to the physical site. To enhance our services, ABWPL developed our own proprietary Construction Drawing Intelligence Platform — Syncdrawings


Explore Syncdrawings Arrow Icon
Syncdrawings Image
About SyncDrawing

Platform Features

Single Source of Truth

All drawings, revisions, markups & approvals in one platform.

QR Just-in-Time Downloads

Site teams access latest approved drawings instantly by scanning.

Strict Revision Control

Version chaos eliminated — every drawing tracked and locked.

Model Verification

Physical drawings linked to the parametric model on-site.